Omega Red becomes accredited with nuclear safety certificate

Omega Red Group is delighted to have gained its ISO 19443 accreditation.

The accreditation, which was awarded by LRQA, demonstrates Omega Red’s commitment to combining best practices in quality and safety with the specific requirements of working in the nuclear industry.

Omega Red has carried out lightning protection and earthing works in the nuclear industry for over 20 years at several sites which include Hinkley Point, Sizewell and Sellafield.

A significant piece of work for the team was its involvement with the Hinkley Point C project and the lift of the steel roof onto the building which was set to house the first of two nuclear reactors.

The team completed the majority of all earthing requirements for the project, including ‘Big Carl’, the largest land based mobile crane in the world, used to lift the roof into place and the 47-meter diameter steel containment shield, a critical safety feature within the reactor build.

Omega Red welcomed the opportunity to be audited by LRQA on whether it was meeting the ISO 19443 standard clauses. The successful audit, and subsequent accreditation, boosts Omega Red’s credibility in providing services that meet nuclear safety and quality requirements, as well as highlighting the reliability of Omega’s processes and its focus on development and continuous improvement.

Roy Westwick, Safety, Health, Environmental and Quality Manager, commented: “Gaining this certification has shown our commitment to nuclear quality and nuclear safety culture and enhances our reputation as a trusted supplier in the nuclear industry. Later this year, we look forward to completing our Focus Audit to ensure we are still meeting the clauses and are continually improving.”

Latest news

Surge protection device
Blog

Is your surge protection strategy fit for purpose in 2027?

Welcome to the digital age. Has your surge protection system caught up?
From building management systems and fire alarms to security networks and EV charging infrastructure, organisations now rely on digital systems to maintain efficient operations and, as buildings become more connected, the potential impact of a surge event continues to grow.

Read more
Case study

Lightning protection testing of the Mersey Gateway Bridge

Omega Red Group originally designed and installed the Mersey Gateway Bridge lightning protection system during the bridge’s construction. As one of the UK’s leading specialists in lightning protection, earthing and surge protection, Omega Red Group continues to support critical infrastructure assets through inspection, testing, maintenance and specialist consultancy services.

Read more
Height safety

Your roof is only as safe as the systems that protect those who access it

Facilities and estates teams across the UK are beginning to prepare buildings for the colder months ahead. Yet while significant attention is given to the maintenance tasks that need to be completed, less consideration is often given to the systems that enable safe access in the first place. Tim Lee, Omega Red Group’s Height Safety Technical Manager, explains why height safety should be part of every winter readiness strategy.

Read more